Concrete is the most cost-effective solid patio surface for Elgin homes. Done right, a concrete patio lasts 25–30 years with almost no maintenance. Done wrong — thin slab, poor base prep, no control joints — and you'll be looking at cracks within a few years.
Texas clay soil moves. It expands when wet, contracts when dry. That movement is what breaks poorly installed concrete slabs. We prep the sub-base properly, grade for drainage away from your foundation, and place control joints so any cracking happens where we intend it to, not randomly across the middle of your patio.

Standard finish. Light texture for slip resistance. The most common and affordable option.
Pressed patterns that mimic stone, brick, or wood. Adds visual interest at $12–$20 per sq ft.
Acid stain or water-based stain for color. Combined with brush or stamp finish for a custom look.
Surface washed to reveal the aggregate. Textured, non-slip, durable finish for pool surrounds.
| Finish Type | Cost per sq ft |
|---|---|
| Brushed Concrete | $8 – $12 |
| Stamped Concrete | $12 – $20 |
| Stained Concrete | $10 – $16 |
| Exposed Aggregate | $10 – $14 |
Prices include grading, forming, reinforcement (rebar or mesh), pour, finish, and control joints. Sealing is optional and adds $1–$2 per sq ft.
A residential patio should be 4 inches thick as a minimum, with rebar or fiber reinforcement. Thin 2–3 inch pours crack quickly in Texas clay soil. We pour at 4 inches minimum on every job.
Light foot traffic after 24–48 hours. Full-strength concrete takes about 28 days to cure, but you can use the patio normally after 7 days. Avoid placing heavy furniture on fresh concrete for the first week.
Sometimes. If the existing slab is structurally sound and there's enough clearance, an overlay may work. If the base slab is heaving, cracked, or poorly graded, we recommend removing it and starting fresh. Pouring over a bad base just covers up the problem for a few years.
Free written estimates. We come to you. No obligation.